ADR-0005: Split Phase 3 into three subphases
Status: Accepted
2026-05-07 forward note: the "3-minute replace-window enforcement" line items below describe the value as originally implemented. Updated to 15 minutes in Part 70; see ADR-0001 Amendment 2026-05-07 for the rationale.
2026-05-12 forward note (Part 120 audit): the "Go service" / "Go relay" / "Go indexer" framing below describes the original Phase 3a/3b implementation plan. Both shipped as Node.js/TypeScript services (
tsxas the runtime). The rationale for choosing TypeScript over Go is captured in ADR-0008 §"Writing the indexer in Go instead of Node.js/TypeScript" (no actively-maintained Go library for Blurt signature verification means we'd re-implement;@beblurt/dblurtgives us the full verify path in TS). This ADR is preserved with the original Go framing intact for historical accuracy. Date: 2026-04-18 Deciders: project maintainer Supersedes: Plan v1.3 §348 description of Phase 3 as a single phase
Context
Plan v1.3 described Phase 3 as a single deliverable covering: posting relay, account creation UI, indexer, peer gossip, REST + RSS, order browse + filter UI, 3-minute replace-window enforcement, sybil fee logic, and self-trade detection.
After completing Phases 1 and 2, several properties of that original scope became clear:
-
Scope is large. Each bullet above is at least one development session of focused work, several are two or three. A single-tarball phase would mean 10+ turns between testable deliverables.
-
Infrastructure precedes feature work. The relay and indexer are Go services, new to the repo; they need scaffolding (module layout, Postgres schema, build system, deployment scripts) before feature code can land. Without a mid-phase checkpoint, the user has to accept a long stretch of "trust me, this is all necessary" work before anything is visible.
-
Each bullet has distinct value on its own. Account creation works without the orderbook UI. Orderbook browse works before posting is wired. Each slice is individually shippable to a staging environment, which means the user can poke at real services and report issues mid-phase rather than at the end.
-
The operator has now completed the Blurt account registration prerequisites.
morphitandmorphit-relayexist on-chain as of 2026-04-18. This unblocks the relay subphase specifically — we can start it immediately rather than gate it behind user action.
Decision
Phase 3 is split into three subphases, each producing a standalone tarball:
-
Phase 3a — Relay + account creation. Go relay service that accepts signed
account_create_with_delegationops from users and pays the Blurt RC cost. Client-side account-registration UI that collects a chosen Blurt account name, signs locally with the user's owner key viauseOwnerKey(), hands the op to the relay, and activates the user's display-name broadcast flow. Exit criterion: a first-time user can onboard end-to-end and end up with a real Blurt account without Morphit ever holding their keys. -
Phase 3b — Indexer + orderbook read. Go indexer service that streams the Blurt chain and materializes Morphit ops into a queryable Postgres database. REST + RSS endpoints with the full filter set promised in the
rss_feedsFAQ entry. SvelteKit orderbook route wired to live data. Peer-to-peer gossip between indexer instances (so the user's app has more than one data source). Exit criterion: a visitor can browse live orders on morphit.io, filter them, and subscribe to an RSS feed of matching orders — even before any orders exist to browse. -
Phase 3c — Order posting + enforcement. Client-side compose UI for new orders.
morphit_order_v1+morphit_order_replace_v1ops with on-chain signing viauseActiveKey()for BLURT fee payments. 3-minute replace-window enforcement at the indexer (per ADR-0001). Sybil fee logic (escalating-per-24h). Self-trade detection. Optional featured-slot auction. Exit criterion: a user can post an order and another user can see it; the fee path works for all three fee currencies (BTC / XMR / BLURT).
Alternatives considered
Single monolithic Phase 3
- Pros: less ADR bookkeeping; one tarball to track.
- Cons: no intermediate testability; 10+ turns of work with no user-facing deliverable until the end; any scope creep pushes the whole phase out; harder to roll back a problematic piece without unpicking unrelated work.
- Rejected.
Split into two subphases (relay+account vs indexer+orderbook+post)
- Pros: only one mid-phase checkpoint to manage.
- Cons: the indexer-plus-post bundle is still 6+ turns and inherits the same "no intermediate testability" problem between them. Also conflates "read path works" with "write path works," which are genuinely separate engineering concerns worth isolating.
- Rejected.
Four+ subphases
- Pros: even finer granularity.
- Cons: diminishing returns. Relay and account-creation really do belong together (the relay exists to serve the account-creation flow and little else for now). Similarly, order posting and its enforcement/anti-abuse logic belong together — shipping posting without enforcement would be a live abuse vector on mainnet Blurt.
- Rejected.
Consequences
Positive
- Each subphase ends with a testable deliverable on staging.
- Scope creep in one subphase doesn't block the others from shipping.
- The user gets three opportunities to redirect the design mid-phase rather than one opportunity at the end.
- Go infrastructure scaffolding (module layout, Postgres wiring, build system) lands in 3a and is amortized across 3b and 3c.
Negative
- Three tarball handoffs instead of one. Each has its own extract-and-review overhead for the user.
- Two
REVIEW-PHASE3a.md/REVIEW-PHASE3b.md/REVIEW-PHASE3c.mddocuments instead of one. Disciplined but not hard. - Subphase boundaries may need to move as reality pushes back. E.g., if the relay ends up smaller than expected, we might pull some indexer scaffolding into 3a. The three-phase structure is the plan, not a contract — an ADR-0006 can re-draw the lines if needed.
Follow-up work
REVIEW-PHASE2.mdentries P2-1 (Blurt account registration) and the operator-action-items section in PLAN.md are now marked complete; 3a can reference those as done rather than blocking on them.- Carry-forward item #11 from Phase 1 (self-hosting docs) lands in 3b, when the indexer is the first Go service users might want to self-host.
- Carry-forward items #16 (WhaleVault / Gravity) and the posting relay's owner-key-never-in-browser invariant interact in Phase 3a; the relay protocol must accept an externally-signed transaction blob so extension-based signing works out of the box.
References
- Plan v1.3 §348 — original Phase 3 single-phase definition.
- ADR-0001 —
custom_jsonreplacement ops (3c enforcement). - ADR-0002 — live keys policy (3a
useOwnerKey()pattern). - REVIEW-PHASE2.md — Phase-1/2 carry-forward items that land in each subphase.